건 축 | 建築2009. 4. 16. 17:37


Architects:
Vaumm Arquitectura y Urbanismo
Location: Gipuzkoa, Spain
Architects: Jon Muniategiandikoetxea Markiegi, Tomas Valenciano Tamayo
Collaborators: Amaya El Busto Saenz, Marta Álvarez Pastor, Sonia Diez de Gereñu, Ainoa Erauskin
Construction Year: 2004
Services: Inconor Ingenieros Consultores
Contractor: FONORTE
Promotor: Inmobiliaria Municipal Eibarresa S.A.
Parking Area: 3,242 sqm
Kindergarden Area: 1,227 sqm
Patio Area: 715 sqm



Settled down on north and west side, the building opens towards the south and south-east, the most open and furthest direction from the walls, batters and staircases that give shape to the park. The diagram of arrangement works out in both floors, the entrance from north face of site and from there, the different elements are organized in two arms, hugging the court.

The classrooms are thought to catch the sunrise, within the timetable of the nursery school. The inside of the building is thought to children´s scale. Corridors´ and classrooms´natural light is through the windows at ground level, letting to admire the outside. The internal cladding colours are warm and alive, and they give the nursery school a ludic character, that goes beyond the interior through a random arrangement of spaces in façade and the use of colour in the balcony towards Sansaburu Street and entrances of building.

The random arrangement of the lamps in the front entrance above the tramex-made closure works as a building lure.


Posted by K_Min
건 축 | 建築2009. 4. 16. 17:36

Architects: Angelo Bucci, Alvaro Puntoni
Location: Carapicuíba, SP, Brazil
Collaborators: Ciro Miguel, Fernando Bizarri, Juliana Braga
Structure: Ibsen Pulleo Uvo, Ruy Bentes
Services: Mauro Rodrigues Pinto
Landscape: Klara Kaiser
Construction: Alexsandro Bremenkamp
Project year: 2003
Construction year: 2008
Site area: 450 sqm
Construction area: 415 sqm
Lighting: Reka
Steel panels: Perfilor
Scaffolding: Peri
Photographs: Nelson Kon

Geographic conditions

The most remarkable feature of the site where the house is located is its depression, in topographical terms. From the street, we cannot clearly see its ground level because the ground surface falls abruptly into a little valley and woods: a stage 6 m below.

section A1

Programmatic requirements

The program joins two different purposes: a house and an office, it is a place to both live and work. Although these two functions share the same space, it is as separate as possible.

Project proposition

The different levels offered by the site were utilized to arrange the two main programs.

The street level was kept free of any enclosed space, it is a kind of “pilotis” with two different areas: the first one is on the ground, very close to the street, and the other one is aerial, as a roof terrace over the building. A bridge, made of steel, connects these two areas. The only entrance to the building is the bridge with its steel grid floor that leads over the open space: downstairs to the house or upstairs to the office.

The house is divided into two levels, both below the street level. Its spaces are integrated with the woods, valley, gardens, and pool located at the ground level. The house incorporates the outside nature indoors: a sliding glass door opens the living room into the terrace,creating one large space. The bedroom and the patios can also be integrated at the lower level.

From the street level, the office is located upstairs. Its dimensions, 3 m wide and 25 m long, making it look like a tube open at both extremities. Therefore, the windows offer new views: more landscape than patios, and more panoramic than an intimate space.

The “tube” only rests over two columns. Reinforced concrete supports the whole building. Besides its materials, concrete and glass, this house is essentially designed based on the site’s geography and landscape. So few elements mean more concentration on the required work during its construction process. It makes it easier to control the budget and it help us focus on the necessary steps to build the house.


Posted by K_Min
건 축 | 建築2009. 4. 16. 17:35

Architect: AMP Arquitectos, S.L.
Location: Tincer, Santa Cruz de Tenerife, Spain
Collaborator: Fernando Martin
Project team: Felipe Artengo Rufino, José Mª Rodríguez Pastrana Malagón, Mariola Merino Martín (PROJECT MANAGEMENT)
Competition team: Adán Ramos ,Claudia Colmar, Mathias Fuchs, Rafaél Hernández, Mónica Rodríguez, Andrés Pedreño
Project year: 2007
Technical Architects: Rafaél Hernández Hernández, Andrés Pedreño Vega
Strcutural Engineers: Fhecor Ingenieros Consultores, Juan José Gallardo
Technical Engineers: Milián Associats S.A., CITE Ingerieros S.L.
Contractor: Dragados, Obras y Proyectos
Constructed Area: 36.000 sqm
Client: Cabildo Insular de Tenerife, Ayuntamiento de Santa Cruz de Tenerife
Photographs: Hisao Suzuki & AMP arquitectos

In the district of Tincer, on the outskirts of Santa Cruz de Tenerife and close to the boundaries between the city, the mountains and the motorway, is the new Tenerife Athletics Centre, a monumental scale project that reflects the volcanic origin in the formalisation of a crater with slopes that are fixed thanks to the Cyclopean volcanic rocks that cover it, creating an image that evokes a pyroclastic cone. This single forceful proposal resolve a programme that integrates a range of different uses, under a unifying petrified mantle. At the same time, this action lays claim to its iconic value through its dimensions, while the impact on the environment is minimised. The crater provides a new raised public space to the exterior, finished in irregular basalt stone, from where a visual relationship is established with the Atlantic Ocean. Inside, we see the different facilities that include a high performance centre, a gymnasium, dressing rooms, warming up track, press room a lecture theatre/projection room, opening onto the indoor space via a set of mobile screen walls, with a capacity for 200 people.The athletics track is situated half way up the slope on the plot, so the earth moving of the excavation and the embankment are off-set in the new topography that is generated.

The terraces, with capacity for 4000 spectators, blur into the boundaries of the plot, where the natural blends with the artificial.

The volcanic basalt stone is the leading player in this proposal, as it is the very same stone that has been dug out from this site to act as a foundation for the great stone banks that will protect athletes from the Trade Winds when indulging in their sport.

The large open empty space that has been used to generate the “indoor space” under a roof, has meant that a large amount of basalt stone has been dug out, covering the needs for this material, re-used in the different building units.

The embankments around the sports arena, which formalise the volcanic cone, have been built by mechanically introducing stone blocks from the excavations, which are place on the steeper slopes with concrete. They have also been placed on the outside face of the wall, and built as dry stone walls on the inside. The inter-cellular spaces between stones are filled with soil, to reinforce the growth of native flora on the embankments.

In the area with the greatest height difference with the surrounding ground, the greater height of the embankment is used to make it habitable and place the residential area for sportsmen there in 12 apartments providing accommodation for 48 athletes.

apartments section 04

The outer slabs that are cut off the volcanic rock that is excavated using an angle grinder are used on the outside, while the cut pieces will be used in the square and the area around the stadium. These outer slabs of stone will provide continuity to the stone embankments, creating a single image of the entire volcanic cone.

Another of the challenges of this design is to integrate it into the town layout by means of a new public space. A large, slightly sloping platform formalises a new public square in the neighbourhood. The stone, this time cut with an angle grinder, to a size of 4 cm thick, harnesses the irregularity of the smaller sized stone blocks in the entire dimension to lay out a large stone mantle that merges together at the edges when it reaches the ends of the perimeter embankments.

The rest of the stone left over from the earth moving has been re-used and crushed mechanically on site, as crushed stone, in a 10-15 cm thick layer to filter rain and irrigation water used on the natural grass.
The ventilation and lighting under the sub-structure of the square is resolved with a passive system that reinforces a system of natural ventilation through the courtyards and overhead systems in the exterior public space.

A new urban landscape is defined in the new sports facility established on the outskirts of Santa Cruz, in which the dissolution of the boundaries between the city and the territory take on a leading value, defining the landscape and how it behaves with the natural environment and the relations that this facility establishes with the city.

The city opens up to the territory and becomes a landscape in itself.


Posted by K_Min