건 축 | 建築2009. 4. 16. 16:17

Architects: ACXT
Location: Bilbao, Spain
Architect in Charge: César Azcárate
Project Architects: Gonzalo Carro, Raimundo Bambó, Javier Vergara, Jorge Minguet, Manuel Andrades, Marc Rips, Iñigo Arana, María Labastida, Ruth Mendoza, Javier Oteiza, Cruz Lacoma, Eloy Olabarri
Project year: 2005
Constructed Area: 450,000 sqm
Project Managment: Alexander Zeuss, Eva Madariaga, Álvaro Gutiérrez
Structure: Fernando del Campo
Electrical Engineer: Javier Aróstegui, Jon Ochoa
Lighting: ALS Lighting
Photographer: Carlos Casariego


The new International Exhibition Centre to be situated in the land formerly occupied by an industrial factory in Barakaldo, is an ambitious project to construct a new exhibition centre which will be provided with the most modern installations from the architectural, functional and technological point of view.

The exhibition use is carried out in 6 pavilions situated 3 to 3 along the main indoor axis. This axis really becomes the backbone of the building, since it houses at different levels the flows which take place at the fair: vehicles, lorries and pedestrians. Thus, on the lower levels there are three underground parking floors to house 4,200 vehicles. On a level above, the lorries also move longitudinally having direct access to the pavilions for loading and unloading. Finally, on the upper level and with direct access from the street, pedestrians walk along a large indoor street with access to natural light, which becomes the main space for relation where different complementary services round up the exhibition use.

At the genesis of the constructive project the aim has been to make use of the potential of the building for the installation of energy saving mechanisms: the placing of solar panels on the roof of the building is going to allow to produce electric energy for self-consumption. The offices will be air-conditioned with a radiant ceiling, an alternative confirmed in view of the need to save energy.

About ACXT

In a cultural environment in which creativity is often likened to personal genius, ACXT is convinced of the potential benefits of combining two separate levels of analysis in the creative process. On the one hand, there is the particular contribution of the individual and, on the other, the collective results of working in groups. In ACXT individuals assume personal responsibility for the development of a project within the framework of an association of professionals. We feel part of a team and of a collective effort that enriches us at a personal level and challenges each one of us to improve as individuals, but also affords us the freedom to give expression to our own proposals. Those responsible for each project are recognised as individual creators and therefore each project is also analysed within the context of the personal development of those who conceived it. As a consequence, the way in which projects are conceived is not the exclusive domain of one person, especially when these are analysed as finished objects. Common aspects do exist but they have more to do with the process and the way the work is delivered than with the final result. We are made richer through a permanent collaboration as professionals and at the same time we are guaranteed sufficient scope to take decisions in accordance with the characteristics of each situation within a system that ensures autonomy and freedom. Our work entails, therefore, an essential paradox, namely, how to reconcile the idea of personal creativity and working in a group.

'건 축 | 建築' 카테고리의 다른 글

Bilbao Exhibition Centre / ACXT  (0) 2009.04.16
Duoc Corporate Building / Sabbagh Arquitectos  (0) 2009.04.16
Signalhuset / NOBEL  (0) 2009.04.16
De Rokade / Arons en Gelauff Architecten  (0) 2009.04.16
Temistocles 12 / JSª  (0) 2009.04.16

Posted by K_Min
건 축 | 建築2009. 4. 16. 16:15

Architect: NOBEL arkitekter a/s
Location: Arne Jacobsens Allé 11, 2300 Copenhagen S, Denmark
Client: KPC-BYG A/S/Lejerbo
Landscape: NOBEL arkitekter a/s
Engineer: COWI A/S
Building contractor: Hoffmann A/S
Size: 8.300 m2
Build: 2004-2006
Project type: Competition
Photographs: Jens Lindhe, NOBEL arkitekter a/s


The Signal House has a central location in Ørestad City, oriented directly towards the curved canal along Arne Jacobsens Allé. The building is elevated on a number of concrete elements lifting the 288 housing units hover above the ground.

The building facades are composed of an external transparent screen of galvanised stretch metal frames that define the building’s outer shape. Together with the external screen, the coloured facade areas create a lively, varied structure that adds presence and identity to the building.

The plan concept is based on the ‘four-in-one’ principle, which means that it is relatively simple to convert four youth units into a single, traditional one-family dwelling.

Posted by K_Min
건 축 | 建築2009. 4. 16. 16:13

Architects: Arons en Gelauff Architecten
Location: Groningen, Netherlands
Design Period: 2003-2007
Construction period: 2005-2007
Programme: Apartments, Parking
Client: Woonstichting (housing association) De Huismeesters, Groningen
Architectural Team: Joost van Bergen, Jan Bart Bouwhuis, Rianne Kreijne, Adrie Laan, Floria Schrage, Aldrik Stegenga, Mahir Dündar, Claudia Temperilli, Mariska Koster-Berbé
Landscape Architect: Kraaivanger Urbis
Contractor: Schutte Bouw, Zwolle
Budget: 9.600.000 EURO (US $14.9 millions)
Constructed Area: 15.400 sqm
Photographs: Allard van der Hoek, Peter de Kan

In 2003, Groningen municipal council launched a project “The Intense City” to keep the city compact by increasing the building density of districts around the Centre. The Rokade Residential Tower Block is situated on one of the first increased density locations, and marks the corner of the Corpus den Hoorn Laan and the Sportlaan, the avenue providing access to the Hoornse Meer district.

De Rokade is immediately adjacent to the nursing and care home, Maartenshof, which has been extensively renovated. The apartments for purchase are intended for the “younger seniors”. The building is linked to Maartenshof in a subtle way. In this way, Maartenshof can supply diverse forms of care to the buyers, without this delicate relationship being visible to the outside world.

Towers in the Netherlands often have a minimum of four dwellings per layer for budgetary reasons. This is also true of De Rokade. The building is 21 floors high and seems very slim due to the cross-shaped ground plan. The four apartments are situated in L-form around the inside angles of the tower. In this way, the dwellings combine the beautiful view with an introverted quality.

The apartments’ façades, load bearing construction and installations have been made ready for three different layout possibilities. The present and future inhabitants will be able to determine their own ground plan in this way. The building is extra sustainable according to Groninger Residential Quality directives.

Instead of an expensive and dark underground parking garage, we have elevated parking to the two floors above the physiotherapists’ practice accommodation. The inhabitants reach their parking place on the first or second floor with a car lift. The garage is naturally ventilated, has daylight and a view and, with construction costs of €15.000 per parking place, is cheaper than the traditional underground box.

'건 축 | 建築' 카테고리의 다른 글

Bilbao Exhibition Centre / ACXT  (0) 2009.04.16
Signalhuset / NOBEL  (0) 2009.04.16
Temistocles 12 / JSª  (0) 2009.04.16
Shopping Roof Apartments / OFIS arhitekti  (0) 2009.04.16
Tetris Apartments / OFIS arhitekti  (0) 2009.04.16

Posted by K_Min